GAS Β· NGET

PeakGen BEGA - Hatfield

PeakGen BEGA - Hatfield is a 6 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Hatfield GSP. The connection agreement is held by Peak Gen Top Co Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-006066
Customer
Peak Gen Top Co Limited
Technology
Oil & AGT (Advanced Gas Turbine)
Total capacity
6 MW
Already connected
6 MW
Connection site
Hatfield GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The connection site could not be placed on the map.

Projects connecting near Hatfield GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem