Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SPTDersalloch Wind Farm Extension
Dersalloch Wind Farm Extension is a 11 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Dersalloch 132/33kV, with capacity due from October 2027. The connection agreement is held by Scottish Power Renewables (UK) Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2027 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-000412
- Customer
- Scottish Power Renewables (UK) Limited
- Technology
- Energy Storage System
- Total capacity
- 11 MW
- Change in this agreement
- +11 MW
- Capacity effective from
- 31 October 2027
- Connection site
- Dersalloch 132/33kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Other projects at Dersalloch 132/33kV
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem