Dersalloch Wind Farm Extension

Dersalloch Wind Farm Extension is a 11 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Dersalloch 132/33kV, with capacity due from October 2027. The connection agreement is held by Scottish Power Renewables (UK) Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2027 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-000412
Customer
Scottish Power Renewables (UK) Limited
Technology
Energy Storage System
Total capacity
11 MW
Change in this agreement
+11 MW
Capacity effective from
31 October 2027
Connection site
Dersalloch 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Dersalloch · Grid map

Other projects at Dersalloch 132/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem