Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Huntworth

Huntworth is a 10 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Taunton GSP. The connection agreement is held by UK Power Reserve Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000254
Customer
UK Power Reserve Limited
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
10 MW
Already connected
10 MW
Connection site
Taunton GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Taunton GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem