Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Broadditch BESS

Broadditch BESS is a 12 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Northfleet East 132kV. The connection agreement is held by Harmony BD Ltd.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-002000
Customer
Harmony BD Ltd
Technology
Energy Storage System
Total capacity
12 MW
Already connected
12 MW
Connection site
Northfleet East 132kV
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Northfleet East Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem