OTHER · SPTAyrshire Grid Services Facility
Ayrshire Grid Services Facility is a 0 MW other project consented, connecting to the SP Transmission (south Scotland) network at Ayrshire Grid 400kV Collector Substation, with capacity due from March 2028. The connection agreement is held by Hunterston Grid 3 Ltd.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Mar 2028 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001090
- Customer
- Hunterston Grid 3 Ltd
- Technology
- Reactive Compensation
- Total capacity
- 0 MW
- Capacity effective from
- 24 March 2028
- Connection site
- Ayrshire Grid 400kV Collector Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
- Connections reform gate
- Gate 2
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem