BATTERY STORAGE Β· SHETKeith 132 Greener Grid Park
Keith 132 Greener Grid Park is a 0 MW battery storage project built and connected, connecting to the SSEN Transmission (north Scotland) network at Keith 132kV Substation. The connection agreement is held by Keith Storage Solutions Limited.
Connection details
- NESO project number
- PRO-001129-1
- Customer
- Keith Storage Solutions Limited
- Technology
- Energy Storage System, Reactive Compensation
- Total capacity
- 0 MW
- Connection site
- Keith 132kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Keith 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem