BATTERY STORAGE · SHETKeith 132 Greener Grid Park
Keith 132 Greener Grid Park is a 48 MW battery storage project under construction or commissioning, connecting to the SSEN Transmission (north Scotland) network at Keith 132kV Substation, with capacity due from April 2029. The connection agreement is held by Keith Storage Solutions Limited.
Project stageUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingFrom Apr 2029 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001129-2
- Customer
- Keith Storage Solutions Limited
- Technology
- Energy Storage System, Reactive Compensation
- Total capacity
- 48 MW
- Change in this agreement
- +48 MW
- Capacity effective from
- 1 April 2029
- Connection site
- Keith 132kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Under Construction/Commissioning
- Connections reform gate
- Gate 2
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.