NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 44 of 46
ProjectCapacityStageConnection siteFrom
Bispham BEGA
Gas · Conrad (Bispham) Limited
20 MWBuilt Penwortham 400kV Substation
National Grid (England & Wales)
Brae WF
Wind + storage · Wind 2 Limited
20 MWScoping Linnmill GSP
SP Transmission (south Scotland)
Aug 2032
Caledonian Paper Mill (Meadowhead)
Gas · Upm-Kymmene (UK) Limited
20 MWBuilt Meadowhead GSP
SP Transmission (south Scotland)
Ceannacroc (part of the Moriston Cascade)
Hydro and pumped storage · Sse Generation Limited
20 MWBuilt Ceannacroc GSP
SSEN Transmission (north Scotland)
Chatterley
Gas · Conrad (Chatterley) Limited
20 MWBuilt Cellarhead 132kV Substation
National Grid (England & Wales)
Conrad (Basingstoke) Limited
Battery storage · Conrad (Basingstoke) Limited
20 MWBuilt Bramley GSP
National Grid (England & Wales)
Farnham BESS
Battery storage · Harmony FM Limited
20 MWBuilt Wrecclesham 33kV
National Grid (England & Wales)
Green Frog @ Down Barn Farm
Gas · Viridis 178 Limited
20 MWBuilt Lovedean 400kV Substation
National Grid (England & Wales)
Hawkers Hill Energy Park
Battery storage · Hawkers Hill Energy Park Limited
20 MWBuilt Hawkers Hill
National Grid (England & Wales)
Invergarry (part of the Garry Cascade)
Hydro and pumped storage · Sse Generation Limited
20 MWBuilt Invergarry 132kV Substation
SSEN Transmission (north Scotland)
Kilmorack (part of the Beauly Cascade)
Hydro and pumped storage · Sse Generation Limited
20 MWBuilt Kilmorack GSP
SSEN Transmission (north Scotland)
Kirk Hill
Onshore wind · Kirk Hill Wind Farm Limited
20 MWBuilt Maybole GSP
SP Transmission (south Scotland)
Lamford Hill
Solar + storage · Benbrack Wind Farm Limited
20 MWScoping Benbrack Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Aug 2029
Lister Drive
Battery storage · Orsted Ess Mersey Limited
20 MWBuilt Lister Drive 132kV Substation
National Grid (England & Wales)
Middlewich BEGA
Gas · Conrad (Middlewich) Limited
20 MWBuilt Carrington GSP (SP Manweb)
National Grid (England & Wales)
Peak Gen Barry
Battery storage · Peak Gen Power 6 Limited
20 MWBuilt Aberthaw 132kV Substation
National Grid (England & Wales)
Peak Gen Bracknell
Gas · Peak Gen Power 11 Limited
20 MWBuilt Fleet 132KV Substation
National Grid (England & Wales)
Peak Gen Makro Exeter
Other · Peak Gen Power 14 Limited
20 MWBuilt Exeter 132kV Substation
National Grid (England & Wales)
Sage
Solar · Sage North Sea Limited
20 MWScoping St Fergus Mobil 132/11kV Substation
SSEN Transmission (north Scotland)
Apr 2029
Shire End Solar Farm
Solar · Qair Scotland Limited
20 MWScoping Abernethy 2 GSP
SSEN Transmission (north Scotland)
Oct 2033
Stoneygroves PV
Solar · Enviromena Project Management UK Limited
20 MWScoping Charleston GSP 132/33kV
SSEN Transmission (north Scotland)
Oct 2031
Talladh a Bheithe
Battery storage · Muirden Energy LLP
20 MWScoping Rannoch GSP
SSEN Transmission (north Scotland)
Oct 2035
Tarland Battery Storage System
Battery storage · Tarland Limited
20 MWConsents Approved Tarland 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2026
Tralorg Wind Farm
Onshore wind · Tralorg Wind Farm Limited
20 MWBuilt Tralorg 33kV
SP Transmission (south Scotland)
Kincorth BESS
Battery storage · Kincorth Energy Storage System Ltd
20 MWScoping Redmoss GSP
SSEN Transmission (north Scotland)
Oct 2031
An Suidhe Wind Farm - Argyll (SRO)
Onshore wind · An Suidhe Wind Farm Limited
19 MWBuilt Eredine GSP
SSEN Transmission (north Scotland)
Ardkinglas
Onshore wind · Scottish Power Renewables (UK) Limited
19 MWBuilt Ardkinglas GSP
SSEN Transmission (north Scotland)
Culligran (part of the Beauly Cascade)
Hydro and pumped storage · Sse Generation Limited
19 MWBuilt Culligran GSP
SSEN Transmission (north Scotland)
Conrad (Swindon) Limited
Battery storage · Conrad (Swindon) Limited
19 MWBuilt Minety GSP
National Grid (England & Wales)
Conrad (Winchester) Limited
Battery storage · Conrad (Winchester) Limited
19 MWBuilt Nursling GSP
National Grid (England & Wales)
Jamesfield Farm Phase 2 Battery Storage
Battery storage · Harmony Jf Limited
19 MWBuilt Abernethy GSP
SSEN Transmission (north Scotland)
Mossford (part of the Conon Cascade)
Hydro and pumped storage · Sse Generation Limited
19 MWBuilt Mossford GSP
SSEN Transmission (north Scotland)
Barns of Wedderburn (ABEI ENERGY GREEN VI)
Solar + storage · Abei Energy Limited
18 MWScoping Milton of Craigie GSP
SSEN Transmission (north Scotland)
Oct 2033
Livishie (part of the Moriston Cascade)
Hydro and pumped storage · Sse Generation Limited
18 MWBuilt Glenmoriston GSP
SSEN Transmission (north Scotland)
Orrin (part of the Conon Cascade)
Hydro and pumped storage · Sse Generation Limited
18 MWBuilt Orrin GSP
SSEN Transmission (north Scotland)
Quoich (part of the Garry Cascade)
Hydro and pumped storage · Sse Generation Limited
18 MWBuilt Quoich GSP
SSEN Transmission (north Scotland)
Tullymurdoch Wind Farm
Onshore wind · Tullymurdoch Limited
18 MWBuilt Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Tullo Wind Farm
Onshore wind · Tullo Wind Farm Limited
17 MWBuilt Bridge of Dun GSP
SSEN Transmission (north Scotland)
Finlarig
Hydro and pumped storage · Sse Generation Limited
17 MWBuilt Killin 132/11kV Substation
SSEN Transmission (north Scotland)
Costa Head
Onshore wind · Costa Head Wind Farm Limited
16 MWScoping Finstown GSP
SSEN Transmission (north Scotland)
Apr 2029
Keithick 16 Solar & BESS
Solar + storage · Sirius Ecodev (Keithick) Ltd
16 MWConsents Approved Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Dec 2026
Plymouth Rock
Gas · Viridis 178 Limited
15 MWBuilt Landulph GSP
National Grid (England & Wales)
Glanford
Other · Epr Glanford Limited
15 MWBuilt Keadby GSP
National Grid (England & Wales)
Green Frog @ Letchworth
Gas · Viridis 178 Limited
15 MWBuilt Wymondley GSP
National Grid (England & Wales)
Nant
Hydro and pumped storage · Sse Generation Limited
15 MWBuilt Nant 132kV Substation
SSEN Transmission (north Scotland)
Pitlochry (part of the Clunie Cascade)
Hydro and pumped storage · Sse Generation Limited
15 MWBuilt Pitlochry (Clunie Cascade Hydro Scheme)
SSEN Transmission (north Scotland)
Stoneyfield
Onshore wind · Wind 2 Limited
15 MWScoping Rothienorman GSP
SSEN Transmission (north Scotland)
Sep 2030
Torr Achilty (part of the Conon Cascade)
Hydro and pumped storage · Sse Generation Limited
15 MWBuilt Torr Achilty (Conan Cascade Hydro Scheme)
SSEN Transmission (north Scotland)
Trafalgar Park
Gas · Viridis 178 Limited
14 MWBuilt Willington 132kV Substation
National Grid (England & Wales)
Crystal Rig III Wind Farm
Onshore wind · Crystal Rig III Limited
14 MWBuilt Crystal Rig 132/33kV
SP Transmission (south Scotland)
Page 44 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.