Chatterley

Chatterley is a 20 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Cellarhead 132kV Substation. The connection agreement is held by Conrad (Chatterley) Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000915
Customer
Conrad (Chatterley) Limited
Technology
Gas Reciprocating
Total capacity
20 MW
Already connected
20 MW
Connection site
Cellarhead 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Cellarhead Β· Grid map

Other projects at Cellarhead 132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem