Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· NGETConrad (Winchester) Limited
Conrad (Winchester) Limited is a 19 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Nursling GSP. The connection agreement is held by Conrad (Winchester) Limited.
Connection details
- NESO project number
- PRO-004022
- Customer
- Conrad (Winchester) Limited
- Technology
- Energy Storage System, Gas Reciprocating
- Total capacity
- 19 MW
- Already connected
- 19 MW
- Connection site
- Nursling GSP
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Nursling GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem