Peak Gen Bracknell

Peak Gen Bracknell is a 20 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Fleet 132KV Substation. The connection agreement is held by Peak Gen Power 11 Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-003898
Customer
Peak Gen Power 11 Limited
Technology
Oil & AGT (Advanced Gas Turbine)
Total capacity
20 MW
Already connected
20 MW
Connection site
Fleet 132KV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Fleet Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem