SOLAR Β· SHETShire End Solar Farm
Shire End Solar Farm is a 20 MW solar project in planning, connecting to the SSEN Transmission (north Scotland) network at Abernethy 2 GSP, with capacity due from October 2033. The connection agreement is held by Qair Scotland Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004902
- Customer
- Qair Scotland Limited
- Technology
- PV Array (Photo Voltaic/solar)
- Total capacity
- 20 MW
- Change in this agreement
- +20 MW
- Capacity effective from
- 31 October 2033
- Connection site
- Abernethy 2 GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem