Grid infrastructure βΊ Connection queue βΊ Solar
SOLAR Β· SHETSage
Sage is a 20 MW solar project in planning, connecting to the SSEN Transmission (north Scotland) network at St Fergus Mobil 132/11kV Substation, with capacity due from April 2029. The connection agreement is held by Sage North Sea Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002119
- Customer
- Sage North Sea Limited
- Technology
- Demand, PV Array (Photo Voltaic/solar)
- Total capacity
- 20 MW
- Change in this agreement
- +20 MW
- Capacity effective from
- 30 April 2029
- Connection site
- St Fergus Mobil 132/11kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem