Grid infrastructure β€Ί Connection queue β€Ί Other

OTHER Β· NGET

Peak Gen Makro Exeter

Peak Gen Makro Exeter is a 20 MW other project built and connected, connecting to the National Grid (England & Wales) network at Exeter 132kV Substation. The connection agreement is held by Peak Gen Power 14 Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-003904
Customer
Peak Gen Power 14 Limited
Technology
Reactive Compensation
Total capacity
20 MW
Already connected
20 MW
Connection site
Exeter 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Exeter Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem