BATTERY STORAGE Β· NGETConrad (Swindon) Limited
Conrad (Swindon) Limited is a 19 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Minety GSP. The connection agreement is held by Conrad (Swindon) Limited.
Connection details
- NESO project number
- PRO-004385
- Customer
- Conrad (Swindon) Limited
- Technology
- Energy Storage System
- Total capacity
- 19 MW
- Already connected
- 19 MW
- Connection site
- Minety GSP
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.