Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Green Frog @ Down Barn Farm

Green Frog @ Down Barn Farm is a 20 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Lovedean 400kV Substation. The connection agreement is held by Viridis 178 Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001261
Customer
Viridis 178 Limited
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
20 MW
Already connected
20 MW
Connection site
Lovedean 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Lovedean Β· Grid map

Other projects at Lovedean 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem