Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · SHETBarns of Wedderburn (ABEI ENERGY GREEN VI)
Barns of Wedderburn (ABEI ENERGY GREEN VI) is a 18 MW solar + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Milton of Craigie GSP, with capacity due from October 2033. The connection agreement is held by Abei Energy Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-005108
- Customer
- Abei Energy Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 18 MW
- Change in this agreement
- +18 MW
- Capacity effective from
- 31 October 2033
- Connection site
- Milton of Craigie GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Milton of Craigie GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem