Grid infrastructure › Connection queue › Hydro and pumped storage
HYDRO AND PUMPED STORAGE · SHETLivishie (part of the Moriston Cascade)
Livishie (part of the Moriston Cascade) is a 18 MW hydro and pumped storage project built and connected, connecting to the SSEN Transmission (north Scotland) network at Glenmoriston GSP. The connection agreement is held by Sse Generation Limited.
Connection details
- NESO project number
- PRO-000173
- Customer
- Sse Generation Limited
- Technology
- Hydro
- Total capacity
- 18 MW
- Already connected
- 18 MW
- Connection site
- Glenmoriston GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The connection site could not be placed on the map.
Other projects at Glenmoriston GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem