🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Hydro and pumped storage

HYDRO AND PUMPED STORAGE · SHET

Livishie (part of the Moriston Cascade)

Livishie (part of the Moriston Cascade) is a 18 MW hydro and pumped storage project built and connected, connecting to the SSEN Transmission (north Scotland) network at Glenmoriston GSP. The connection agreement is held by Sse Generation Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000173
Customer
Sse Generation Limited
Technology
Hydro
Total capacity
18 MW
Already connected
18 MW
Connection site
Glenmoriston GSP
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The connection site could not be placed on the map.

Projects connecting near Glenmoriston GSP · Grid map

Other projects at Glenmoriston GSP

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem