HYDRO AND PUMPED STORAGE · SHETGlenmoriston (part of the Moriston Cascade)
Glenmoriston (part of the Moriston Cascade) is a 40 MW hydro and pumped storage project built and connected, connecting to the SSEN Transmission (north Scotland) network at Glenmoriston GSP. The connection agreement is held by Sse Generation Limited.
Connection details
- NESO project number
- PRO-000083
- Customer
- Sse Generation Limited
- Technology
- Hydro
- Total capacity
- 40 MW
- Already connected
- 40 MW
- Connection site
- Glenmoriston GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built