Grid infrastructure βΊ Connection queue βΊ Gas
GAS Β· NGETBispham BEGA
Bispham BEGA is a 20 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Penwortham 400kV Substation. The connection agreement is held by Conrad (Bispham) Limited.
Connection details
- NESO project number
- PRO-000945
- Customer
- Conrad (Bispham) Limited
- Technology
- Gas Reciprocating
- Total capacity
- 20 MW
- Already connected
- 20 MW
- Connection site
- Penwortham 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Penwortham 400kV Substation
- Morgan Offshore Wind FarmOffshore wind Β· 1.5 GW Β· Scoping
- Penwortham Green Energy CentreSolar + storage Β· 600 MW Β· Awaiting Consents
- Morecambe Offshore Wind FarmOffshore wind Β· 480 MW Β· Scoping
- Penwortham BESSBattery storage Β· 57 MW Β· Scoping
- Penwortham BESSBattery storage Β· 57 MW Β· Consents Approved
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem