🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Hydro and pumped storage

HYDRO AND PUMPED STORAGE · SHET

Pitlochry (part of the Clunie Cascade)

Pitlochry (part of the Clunie Cascade) is a 15 MW hydro and pumped storage project built and connected, connecting to the SSEN Transmission (north Scotland) network at Pitlochry (Clunie Cascade Hydro Scheme). The connection agreement is held by Sse Generation Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000179
Customer
Sse Generation Limited
Technology
Hydro
Total capacity
15 MW
Already connected
15 MW
Connection site
Pitlochry (Clunie Cascade Hydro Scheme)
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Pitlochry (Clunie Cascade Hydro Scheme) · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem