Grid infrastructure βΊ Connection queue βΊ Other
OTHER Β· NGETBolney Grid Stability Services
Bolney Grid Stability Services is a 0 MW other project in planning, connecting to the National Grid (England & Wales) network at Bolney 400kV Substation, with capacity due from October 2031. The connection agreement is held by Wp Grid Services 13 Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003966
- Customer
- Wp Grid Services 13 Limited
- Technology
- Reactive Compensation
- Total capacity
- 0 MW
- Capacity effective from
- 31 October 2031
- Connection site
- Bolney 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Bolney 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem