πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Other

OTHER Β· NGET

Lister Drive 275kV

Lister Drive 275kV is a 0 MW other project built and connected, connecting to the National Grid (England & Wales) network at Lister Drive 275kV Substation. The connection agreement is held by Lister Drive Solutions Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001248
Customer
Lister Drive Solutions Limited
Technology
Reactive Compensation
Total capacity
0 MW
Connection site
Lister Drive 275kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Lister Drive Β· Grid map

Other projects at Lister Drive 275kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem