Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Whitelaw Brae BESS

Whitelaw Brae BESS is a 1 MW battery storage project under construction or commissioning, connecting to the SP Transmission (south Scotland) network at Whitelaw Brae BESS 33kV substation, with capacity due from July 2026. The connection agreement is held by Buk23 Limited.

Project stageUnder construction
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingFrom Jul 2026 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-003247
Customer
Buk23 Limited
Technology
Energy Storage System
Total capacity
1 MW
Change in this agreement
+1 MW
Capacity effective from
31 July 2026
Connection site
Whitelaw Brae BESS 33kV substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Under Construction/Commissioning
Connections reform gate
Gate 2

Connection site

The connection site could not be placed on the map.

Projects connecting near Whitelaw Brae BESS · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem