Grid infrastructure › Connection queue › Other
OTHER · SPTFife Grid Services
Fife Grid Services is a 0 MW other project in planning, connecting to the SP Transmission (south Scotland) network at Fife Grid Services Facility 275kV Substation, with capacity due from July 2027. The connection agreement is held by Kincardine Grid 3 Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jul 2027 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-000453
- Customer
- Kincardine Grid 3 Ltd
- Technology
- Reactive Compensation
- Total capacity
- 0 MW
- Capacity effective from
- 30 July 2027
- Connection site
- Fife Grid Services Facility 275kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Projects connecting near Fife Grid Services Facility · Grid map
Other projects at Fife Grid Services Facility 275kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem