GAS Β· NGETGreen Frog at Lester Way
Green Frog at Lester Way is a 12 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Cowley GSP. The connection agreement is held by Viridis 178 Limited.
Connection details
- NESO project number
- PRO-000244
- Customer
- Viridis 178 Limited
- Technology
- OCGT (Open Cycle Gas Turbine)
- Total capacity
- 12 MW
- Already connected
- 12 MW
- Connection site
- Cowley GSP
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Cowley GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem