Grid infrastructure › Connection queue › Onshore wind

ONSHORE WIND · SPT

Dealanach WLC WF

Dealanach WLC WF is a 12 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Hopsrig Collector 132/33kV Substation, with capacity due from December 2026. The connection agreement is held by Dealanach Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Dec 2026 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001722
Customer
Dealanach Limited
Technology
Wind Onshore
Total capacity
12 MW
Change in this agreement
+12 MW
Capacity effective from
15 December 2026
Connection site
Hopsrig Collector 132/33kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Hopsrig Collector · Grid map

Other projects at Hopsrig Collector 132/33kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem