Elvanfoot (9.8 MW) Energy Storage

Elvanfoot (9.8 MW) Energy Storage is a 9.8 MW battery storage project consented, connecting to the SP Transmission (south Scotland) network at Elvanfoot 400/275/33kV, with capacity due from April 2027. The connection agreement is held by Elvanfoot Energy Storage Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2027 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001721
Customer
Elvanfoot Energy Storage Limited
Technology
Energy Storage System
Total capacity
9.8 MW
Change in this agreement
+9.8 MW
Capacity effective from
30 April 2027
Connection site
Elvanfoot 400/275/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Elvanfoot · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem