United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in the USA — page 223
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hanson Storage Battery storage · Hanson Solar, LLC |
101 MW | Withdrawn / abandoned |
| Crowded Star I BESS Other · Jones City Solar, LLC |
101 MW | Withdrawn / abandoned |
| Tenacity Solar Solar |
101 MW | Withdrawn / abandoned |
| Parthenon Energy Battery storage · Parthenon Energy, LLC |
101 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2015-091, Stark County Onshore wind |
101 MW | Withdrawn / abandoned |
| Solar project AF1-335, Berks County Solar |
101 MW | Withdrawn / abandoned |
| Palacios Bay Energy Storage Battery storage · Palacios Bay Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Other project GEN-2015-056, Roosevelt County Other |
101 MW | Withdrawn / abandoned |
| Onshore wind project J159, Macon County Onshore wind |
101 MW | Withdrawn / abandoned |
| Silver Fox Solar Solar · Industrial Lima Project LLC |
101 MW | Withdrawn / abandoned |
| Palm Bluff Energy Storage Other · Palm Bluff Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Concord Wind Onshore wind · Concord Wind Power LLC |
101 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2012-002, Scott County Onshore wind |
101 MW | Withdrawn / abandoned |
| Onshore wind project J160, Macon County Onshore wind |
101 MW | Withdrawn / abandoned |
| Herculis Battery storage |
101 MW | Withdrawn / abandoned |
| McCook Energy Storage Other · McCook Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Antoninus Energy Storage Battery storage · Antoninus Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2008-025, Sherman County Onshore wind |
101 MW | Withdrawn / abandoned |
| Solar Solar |
101 MW | Withdrawn / abandoned |
| Port City Energy Storage Battery storage · Port City Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Granite Mountain Wind Power (Duke Energy Generation Services) Onshore wind |
101 MW | Withdrawn / abandoned |
| Ambrose Energy Storage Other · Ambrose Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Nerva Energy Storage Battery storage · Nerva Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Pelton Lake Energy Storage Other · Pelton Lake Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Canyonland Energy Storage Other · Canyonland Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Battery Storage addition(QP1192) Solar + storage |
101 MW | Withdrawn / abandoned |
| Grace Bear Solar Solar · Industrial India Project LLC |
101 MW | Withdrawn / abandoned |
| Eastwater Energy Storage Battery storage · Grid Connected Infrastructure, LLC |
101 MW | Withdrawn / abandoned |
| Solar Solar |
101 MW | Withdrawn / abandoned |
| Elbrus Energy Storage Battery storage |
101 MW | Withdrawn / abandoned |
| Consecha Battery storage |
101 MW | Withdrawn / abandoned |
| Onshore wind project G734, Brookings County Onshore wind |
101 MW | Withdrawn / abandoned |
| Solar project LGE-GIS-2019-007, Scott County Solar |
101 MW | Withdrawn / abandoned |
| Albatross Solar Solar · Albatross Solar, LLC |
101 MW | Withdrawn / abandoned |
| Onshore wind project Q24, Potter County Onshore wind |
101 MW | Withdrawn / abandoned |
| Onshore wind project G635, Deuel County Onshore wind |
101 MW | Withdrawn / abandoned |
| Onshore wind project G0384, Coos County Onshore wind |
101 MW | Withdrawn / abandoned |
| Onshore wind project G967, Newton County Onshore wind |
101 MW | Withdrawn / abandoned |
| Onshore wind project G0398, Klickitat County Onshore wind |
101 MW | Withdrawn / abandoned |
| Onshore wind project J306, Traverse County Onshore wind |
101 MW | Withdrawn / abandoned |
| Payne Mountain 138 kV Onshore wind · Sour Lake Oil and Gas, LLC |
101 MW | Withdrawn / abandoned |
| Payne Mt Wind Onshore wind · Sour Lake Oil and Gas |
101 MW | Withdrawn / abandoned |
| Onshore wind project G0467, Wasco County Onshore wind |
101 MW | Withdrawn / abandoned |
| Onshore wind project 4895, Hoke County Onshore wind · Masked |
101 MW | Withdrawn / abandoned |
| Onshore wind project J314, Columbia County Onshore wind |
101 MW | Withdrawn / abandoned |
| Onshore wind project 30, Uinta County Onshore wind |
101 MW | Withdrawn / abandoned |
| Other project 235, Cherokee County Other |
101 MW | Withdrawn / abandoned |
| Onshore wind project 4896, Hoke County Onshore wind · Masked |
101 MW | Withdrawn / abandoned |
| Onshore wind project 810, Uinta County Onshore wind |
101 MW | Withdrawn / abandoned |
| Onshore wind project G977, Calumet County Onshore wind |
101 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)