ONSHORE WIND Β· WESTOnshore wind project G0384, Coos County
Onshore wind project G0384, Coos County is a 101 MW onshore wind request withdrawn in the West interconnection queue, in Coos County, Oregon.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G0384
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- Bandon 115 kV Substation
- Location
- Coos County, Oregon
- Technology
- Wind: 101 MW
- Total requested
- 101 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 6 October 2009
- Proposed online date
- June 2011
Location
Marker shows the centre of Coos County; the queue data does not give exact sites.
Other requests in Coos County
- Onshore wind project G0848, Coos CountyOnshore wind Β· 1,000 MW Β· withdrawn
- Battery storage project G0725, Coos CountyBattery storage Β· 600 MW Β· withdrawn
- Gas project 510, Coos CountyGas Β· 336 MW Β· withdrawn
- Gas project G0352, Coos CountyGas Β· 120 MW Β· withdrawn
- Onshore wind project 297, Coos CountyOnshore wind Β· 101 MW Β· withdrawn
- Gas project 91, Coos CountyGas Β· 44.2 MW Β· withdrawn
- Battery storage project C2-188, Coos CountyBattery storage Β· 40.0 MW Β· withdrawn
- Battery storage project C2-189, Coos CountyBattery storage Β· 40.0 MW Β· withdrawn
- Battery storage project C2-191, Coos CountyBattery storage Β· 40.0 MW Β· withdrawn
- Battery storage project C2-190, Coos CountyBattery storage Β· 40.0 MW Β· withdrawn
- Gas project 57, Coos CountyGas Β· 20.0 MW Β· withdrawn
- Solar project 606, Coos CountySolar Β· 9.6 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem