SOLAR Β· SOUTHEAST

Solar project LGE-GIS-2019-007, Scott County

Solar project LGE-GIS-2019-007, Scott County is a 101 MW solar request withdrawn in the Southeast interconnection queue, in Scott County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedSep 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
LGE-GIS-2019-007
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Louisville Gas & Electric and Kentucky Utilities Energy
Connection point (POI)
Primary: Scott 138 kV substation; Alternate: POI the Scott β€šΓ„Γ¬ Adams 138 kV line
Location
Scott County, Kentucky
Technology
Solar: 101 MW
Total requested
101 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
18 March 2019
Proposed online date
October 2021
Withdrawn
September 2019

Location

Marker shows the centre of Scott County; the queue data does not give exact sites.