ONSHORE WIND Β· SPP

Onshore wind project GEN-2015-091, Stark County

Onshore wind project GEN-2015-091, Stark County is a 101 MW onshore wind request withdrawn in the SPP interconnection queue, in Stark County, North Dakota, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2015 (completed)
  2. Withdrawn / abandonedJun 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2015-091
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Belfield-Rhame 230kV
Location
Stark County, North Dakota
Technology
Wind: 101 MW
Total requested
101 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
15 October 2015
Proposed online date
December 2018
Withdrawn
June 2017

Location

Marker shows the centre of Stark County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Stark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem