United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

ONSHORE WIND Β· SPP

Onshore wind project GEN-2016-066, Stark County

Onshore wind project GEN-2016-066, Stark County is a 13.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Stark County, North Dakota, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2016 (completed)
  2. Withdrawn / abandonedMar 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-066
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Tap Rhame-Belfield 230kV
Location
Stark County, North Dakota
Technology
Wind: 13.0 MW
Total requested
13.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
24 March 2016
Proposed online date
October 2016
Withdrawn
March 2017

Location

Marker shows the centre of Stark County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Stark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem