United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

ONSHORE WIND Β· MISO

Onshore wind project G977, Calumet County

Onshore wind project G977, Calumet County is a 101 MW onshore wind request withdrawn in the MISO interconnection queue, in Calumet County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2008 (completed)
  2. Withdrawn / abandonedNov 2009 (project stopped here)
  3. ConsentedNov 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G977
Grid region
MISO (Midcontinent)
Connection point (POI)
Forest Junction 138kV Substation
Location
Calumet County, Wisconsin
Technology
Wind: 101 MW
Total requested
101 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
4 March 2008
Agreement signed
17 November 2009
Proposed online date
June 2011
Withdrawn
November 2009

Location

Marker shows the centre of Calumet County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Calumet County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem