πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

GAS Β· MISO

Gas project J335, Calumet County

Gas project J335, Calumet County is a 551 MW gas request withdrawn in the MISO interconnection queue, in Calumet County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2014 (completed)
  2. Withdrawn / abandonedSep 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J335
Grid region
MISO (Midcontinent)
Connection point (POI)
WPS Forest Junction 345 kV substation
Location
Calumet County, Wisconsin
Technology
Gas: 551 MW
Total requested
551 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
16 May 2014
Withdrawn
September 2015

Location

Marker shows the centre of Calumet County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Calumet County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem