Elbrus Energy Storage

Elbrus Energy Storage is a 101 MW battery storage request withdrawn in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedDec 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1946
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Le Grand Substation 115 kV
Location
Merced County, California
Technology
Battery: 101 MW
Total requested
101 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
January 2025
Withdrawn
December 2022

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.