United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Cantus

Cantus is a 499 MW solar + storage request in interconnection study in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.

Queue statusIn planning
  1. PlanningQueued Apr 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2031 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2280
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
FINK SW STA 230 kV
Location
Merced County, California
Technology
Solar: 250 MW · Battery: 250 MW
Total requested
499 MW
Service type
Network resource (NRIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Active
Entered queue
17 April 2023
Proposed online date
March 2031

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Merced County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem