Onshore wind project G0398, Klickitat County

Onshore wind project G0398, Klickitat County is a 101 MW onshore wind request withdrawn in the West interconnection queue, in Klickitat County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0398
Grid region
West (non-ISO utilities)
Connection point (POI)
BPAβ€šΓ„Γ΄s Transmission Facilities at or near Centerville, Wash. at 230 kV
Location
Klickitat County, Washington
Technology
Wind: 101 MW
Total requested
101 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
15 December 2009
Proposed online date
December 2011

Location

Marker shows the centre of Klickitat County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Klickitat County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem