United States › Grid › Interconnection queues › Texas

ONSHORE WIND · WEST

Granite Mountain Wind Power (Duke Energy Generation Services)

Granite Mountain Wind Power (Duke Energy Generation Services) is a 101 MW onshore wind request withdrawn in the West interconnection queue, in Hudspeth County, Texas, connecting to El Paso Electric Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
34
Grid region
West (non-ISO utilities)
Utility / transmission owner
El Paso Electric Company
Connection point (POI)
Coyote-RGDC 115 kV line @ point of EPE ownership
Location
Hudspeth County, Texas
Technology
Wind: 101 MW
Total requested
101 MW
Service type
NRIS and ERIS
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
20 August 2010
Proposed online date
December 2012

Location

Marker shows the centre of Hudspeth County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Hudspeth County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem