United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 22
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Airtricity Lone Wolf Onshore wind · Airtricity, Inc. |
42.0 MW | Withdrawn / abandoned |
| Carya Solar Solar · Sun Edison |
42.0 MW | Withdrawn / abandoned |
| Eiffel Solar II Solar · PARIS SOLAR FARM, LLC |
41.7 MW | Withdrawn / abandoned |
| Portside Energy Center (Solar) SLF Solar · Portside Energy Center, LLC |
41.1 MW | Withdrawn / abandoned |
| Portside Energy Center (BESS) SLF Battery storage · Portside Energy Center, LLC |
41.1 MW | Withdrawn / abandoned |
| Prairie Point Battery Other · Nextera |
41.0 MW | Withdrawn / abandoned |
| LWPC Wind Onshore wind · Lonestar Wind Power |
41.0 MW | Withdrawn / abandoned |
| Coyote Run Wind Farm Addition Onshore wind · FPL Energy, LLC |
41.0 MW | Withdrawn / abandoned |
| Kiskadee Trail Solar Solar · Kiskadee Solar, LLC |
40.9 MW | Withdrawn / abandoned |
| Kiskadee Trail Storage Battery storage · Kiskadee Storage, LLC |
40.8 MW | Withdrawn / abandoned |
| Cane Flats Storage Other · Cane Flats Solar Project, LLC |
40.6 MW | Withdrawn / abandoned |
| City Breeze II BESS Other · Black Mountain Energy Storage II |
40.4 MW | Withdrawn / abandoned |
| Ennis-Tractebel (Config 1) Repower Gas |
40.3 MW | Withdrawn / abandoned |
| King Mt Solar Solar · Nextera |
40.0 MW | Withdrawn / abandoned |
| Colorado Bend I Repower Gas |
40.0 MW | Withdrawn / abandoned |
| Rubi Storage Other · Belltown Power Texas |
40.0 MW | Withdrawn / abandoned |
| Uvalde Solar Solar · First Solar |
40.0 MW | Withdrawn / abandoned |
| Deepwater Energy Storage Battery storage · AES Energy |
40.0 MW | Withdrawn / abandoned |
| Panther Creek S 1 Solar · Eon |
40.0 MW | Withdrawn / abandoned |
| Bowhead Storage Battery storage · Baffin Bay Solar, LLC |
40.0 MW | Withdrawn / abandoned |
| West Texas Angelos Solar 2 Solar · Navasota Energy Management, LLC |
40.0 MW | Withdrawn / abandoned |
| Solemio Springs Solar · Alpin Sun |
39.9 MW | Withdrawn / abandoned |
| Olive Solar Solar · ABEI ENERGY&INFRASTRUCTURE LLC |
39.6 MW | Withdrawn / abandoned |
| Wild Horse Wind Farm 2 Onshore wind · Wild Horse Wind Farm II, LLC |
39.0 MW | Withdrawn / abandoned |
| Millhouse Storage Other · Cypress Creek Renewables |
38.0 MW | Withdrawn / abandoned |
| Long Draw Energy Project Solar · Turner/Ross Wind Development LLC |
38.0 MW | Withdrawn / abandoned |
| Cabeza de Vaca Solar · PREMIER ENGINEERING USA CORP |
37.8 MW | Withdrawn / abandoned |
| Travis Kimbro BESS Battery storage · Travis Kimbro BESS LLC |
36.8 MW | Withdrawn / abandoned |
| Hilltop Wind Energy Onshore wind · GreenHunter Wind Energy |
36.0 MW | Withdrawn / abandoned |
| Big Lake Windfarm Onshore wind · Airtricity, Inc. |
36.0 MW | Withdrawn / abandoned |
| Arroyo Storage (Placeholder) Other · BT Cantwell Solar, LLC |
35.3 MW | Withdrawn / abandoned |
| Harbor Sunrise Industrial Wind Park Onshore wind · Revolution Energy, LLC. |
35.0 MW | Withdrawn / abandoned |
| Longbow Storage Other · Cypress Creek Renewables |
35.0 MW | Withdrawn / abandoned |
| Permian Wind Onshore wind · Permian Wind, LLC |
35.0 MW | Withdrawn / abandoned |
| XE RHODA Solar Solar · Milam 2 Solar |
33.7 MW | Withdrawn / abandoned |
| Mills Prairie Solar Solar · Mills Solar, LLC |
33.0 MW | Withdrawn / abandoned |
| Mills Prairie Storage Battery storage · Mills Storage, LLC |
33.0 MW | Withdrawn / abandoned |
| Angels Creek Battery storage · Angels Creek LLC |
31.7 MW | Withdrawn / abandoned |
| Shannon-1 Wind Farm Phase 1 Onshore wind · Shannon-1 Wind Farm, LLC |
30.4 MW | Withdrawn / abandoned |
| Castle Gap Solar 2 Solar · Solar Prime |
30.0 MW | Withdrawn / abandoned |
| Alpine 1 Solar Solar · First Solar |
30.0 MW | Withdrawn / abandoned |
| Mustang Wind Onshore wind · Pioneer Green Energy, LLC |
30.0 MW | Withdrawn / abandoned |
| Flo Mot Onshore wind · Your Resources, LLC |
30.0 MW | Withdrawn / abandoned |
| Sandine Solar Solar · Innovative Solar |
30.0 MW | Withdrawn / abandoned |
| Cargil Solar batt Battery storage · Cypress Creek Renewables |
30.0 MW | Withdrawn / abandoned |
| Howle Storage Other · Howle Solar LLC |
30.0 MW | Withdrawn / abandoned |
| Mustang Solar Project Solar · Pioneer Green Energy, LLC |
30.0 MW | Withdrawn / abandoned |
| Panther Creek Solar III Solar · EC&R Renewable PV Solar |
30.0 MW | Withdrawn / abandoned |
| Marfa 1 Solar Solar · First Solar |
30.0 MW | Withdrawn / abandoned |
| BRP Hestia BESS Battery storage · BRP Hestia BESS LLC |
29.1 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)