🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

GAS · ERCOT

Ennis-Tractebel (Config 1) Repower

Ennis-Tractebel (Config 1) Repower is a 40.3 MW gas request withdrawn in the ERCOT interconnection queue, in Ellis County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2019 (completed)
  2. Withdrawn / abandonedSep 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0448
Grid region
ERCOT (Texas)
Location
Ellis County, Texas
Technology
Gas: 40.3 MW
Total requested
40.3 MW
Queue status
Withdrawn
Entered queue
31 October 2019
Withdrawn
September 2020

Location

Marker shows the centre of Ellis County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Ellis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem