SOLAR Β· ERCOT

West Texas Angelos Solar 2

West Texas Angelos Solar 2 is a 40.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
12INR0057
Grid region
ERCOT (Texas)
Developer
Navasota Energy Management, LLC
Technology
Solar: 40.0 MW
Total requested
40.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
20 October 2010
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem