United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTTravis Kimbro BESS
Travis Kimbro BESS is a 36.8 MW battery storage request withdrawn in the ERCOT interconnection queue, in Travis County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- ConsentedOct 2024 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0330
- Grid region
- ERCOT (Texas)
- Developer
- Travis Kimbro BESS LLC
- Connection point (POI)
- 7337 Kimbro 138kV
- Location
- Travis County, Texas
- Technology
- Battery: 36.8 MW
- Total requested
- 36.8 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 1 September 2022
- Agreement signed
- 31 October 2024
- Proposed online date
- September 2028
- Withdrawn
- December 2025
Location
Marker shows the centre of Travis County; the queue data does not give exact sites.
Other requests in Travis County
- Giga Texas Data CenterBattery storage · 133 MW · agreement signed
- Blackland Prairie 1 Energy StorageBattery storage · 102 MW · in study
- Blackland Prairie 2 Energy StorageBattery storage · 102 MW · in study
- Blackland Prairie 3 Energy StorageBattery storage · 102 MW · in study
- AP GreenportBattery storage · 101 MW · in study
- East Blackland Battery Storage SLFSolar + storage · 75.0 MW · in study
- Venture Hill StorageBattery storage · 70.4 MW · in study
- Giga Austin SolarSolar · -53.3 MW · in study
- East Blackland SolarSolar + storage · 144 MW · built
- Giga Texas Energy StorageOther · 131 MW · built
- Silicon Hill StorageOther · 105 MW · built
- Pflugerville 2 SolarSolar · 120 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem