BATTERY STORAGE Β· ERCOTDeepwater Energy Storage
Deepwater Energy Storage is a 40.0 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedJan 2013 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 10INR0089
- Grid region
- ERCOT (Texas)
- Developer
- AES Energy
- Technology
- Battery: 40.0 MW
- Total requested
- 40.0 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 19 November 2009
- Agreement signed
- 21 January 2013
- Proposed online date
- March 2014
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem