United States βΊ Grid βΊ Interconnection queues βΊ Texas
BATTERY STORAGE Β· ERCOTBowhead Storage
Bowhead Storage is a 40.0 MW battery storage request withdrawn in the ERCOT interconnection queue, in Kleberg County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2021 (completed)
- Withdrawn / abandonedApr 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0179
- Grid region
- ERCOT (Texas)
- Developer
- Baffin Bay Solar, LLC
- Connection point (POI)
- Tap 138kV 8519 Kleberg βΓΓ¬ 8518 Kingsville
- Location
- Kleberg County, Texas
- Technology
- Battery: 40.0 MW
- Total requested
- 40.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 2 December 2021
- Proposed online date
- January 2026
- Withdrawn
- April 2025
Location
Marker shows the centre of Kleberg County; the queue data does not give exact sites.
Other requests in Kleberg County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem