BATTERY STORAGE Β· ERCOT

Cargil Solar batt

Cargil Solar batt is a 30.0 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0034_ES
Grid region
ERCOT (Texas)
Developer
Cypress Creek Renewables
Connection point (POI)
tap 69kV 8231 Uvalde - 8672 LaPryor
Technology
Battery: 30.0 MW
Total requested
30.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
2 November 2017
Proposed online date
October 2020

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem