BATTERY STORAGE · ERCOT

Portside Energy Center (BESS) SLF

Portside Energy Center (BESS) SLF is a 41.1 MW battery storage request withdrawn in the ERCOT interconnection queue, in Victoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2022 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. ConsentedApr 2024 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0403
Grid region
ERCOT (Texas)
Developer
Portside Energy Center, LLC
Connection point (POI)
80064 Chocolate Bayou 138kV
Location
Victoria County, Texas
Technology
Battery: 41.1 MW
Total requested
41.1 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
14 November 2022
Agreement signed
5 April 2024
Proposed online date
December 2026
Withdrawn
July 2025

Location

Marker shows the centre of Victoria County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Victoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem