BATTERY STORAGE · ERCOTPortside Energy Center (BESS) SLF
Portside Energy Center (BESS) SLF is a 41.1 MW battery storage request withdrawn in the ERCOT interconnection queue, in Victoria County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- ConsentedApr 2024 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0403
- Grid region
- ERCOT (Texas)
- Developer
- Portside Energy Center, LLC
- Connection point (POI)
- 80064 Chocolate Bayou 138kV
- Location
- Victoria County, Texas
- Technology
- Battery: 41.1 MW
- Total requested
- 41.1 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 14 November 2022
- Agreement signed
- 5 April 2024
- Proposed online date
- December 2026
- Withdrawn
- July 2025
Location
Marker shows the centre of Victoria County; the queue data does not give exact sites.
Other requests in Victoria County
- Crossroads WindOnshore wind · 277 MW · agreement signed
- Leopard BESSBattery storage · 264 MW · agreement signed
- Oriana SolarSolar + storage · 181 MW · agreement signed
- Two Brothers ESSBattery storage · 152 MW · agreement signed
- Brizo BESSBattery storage · 141 MW · agreement signed
- Oriana BESSSolar + storage · 60.3 MW · agreement signed
- HyFuels Green Lake SolarSolar · 347 MW · in study
- HyFuels Calhoun SolarSolar · 302 MW · in study
- Marcos Solar SLFSolar + storage · 216 MW · in study
- Oak Belt StorageSolar + storage · 207 MW · in study
- Calico BESSBattery storage · 205 MW · in study
- Arpeggio BESSBattery storage · 201 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem