United States βΊ Grid βΊ Interconnection queues
BATTERY STORAGE Β· ERCOTAngels Creek
Angels Creek is a 31.7 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0508
- Grid region
- ERCOT (Texas)
- Developer
- Angels Creek LLC
- Connection point (POI)
- 5888 Bruni 69kV
- Technology
- Battery: 31.7 MW
- Total requested
- 31.7 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 3 June 2020
- Proposed online date
- June 2026
- Withdrawn
- August 2025
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem