Airtricity Lone Wolf is a 42.0 MW onshore wind request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 09INR0070
- Grid region
- ERCOT (Texas)
- Developer
- Airtricity, Inc.
- Technology
- Wind: 42.0 MW
- Total requested
- 42.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 29 November 2007
- Proposed online date
- December 2050
Location
No county location in the queue data.