United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

LWPC Wind

LWPC Wind is a 41.0 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
11INR0093
Grid region
ERCOT (Texas)
Developer
Lonestar Wind Power
Connection point (POI)
Odem (#8810) or Sodville (#5618)-West Sinton (#5620) or Pelican (#80259)-Lon Hill (#8452)
Technology
Wind: 41.0 MW
Total requested
41.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
18 October 2010
Proposed online date
December 2017

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem